Node mix
Four Node Families Earn Four-Fifths of the Revenue
| Node | Share of wafer revenue | Main fabs | Example products |
|---|---|---|---|
| N2 (2nm) | 8% | Fab 20, Hsinchu; Fab 22, Kaohsiung | First gate-all-around node; volume since late 2025; phone and AI chips ramping |
| N3 (3nm) | 33% | Fab 18, Tainan | NVIDIA Rubin, Google TPU Ironwood, AWS Trainium3, Apple A19 Pro |
| N5 and N4 (5nm class) | 28% | Fab 18, Tainan; Fab 21, Arizona | NVIDIA Blackwell Ultra B300 on 4NP |
| N7 and N6 (7nm class) | 10% | Fab 15, Taichung | Older GPUs, networking, I/O dies |
| 16nm and older | 21% | Fab 12, Fab 14, JASM, Nanjing | Microcontrollers, image sensors, power management, RF |
TSMC's third-quarter 2026 revenue was $46.7 billion, up 41.2% in dollars, with a 66.4% gross margin. High-performance computing, which covers AI accelerators, server CPUs and custom chips, was 68% of revenue and smartphones 21%. A16, which adds backside power delivery (Super Power Rail) to the 2nm transistor, follows in the second half of 2026. Node definitions are on Process Nodes.
Sites
Outside Taiwan, Only Arizona Makes Leading-Edge Wafers
- Made in US
- Some US volume
- US planned
- Made abroad
| Site | Node | Status | US status |
|---|---|---|---|
| Fab 20, Hsinchu and Fab 22, Kaohsiung | N2, A16 | Volume ramp | Made abroad |
| Fab 18, Tainan | N5, N3 | Volume; the largest leading-edge site | Made abroad |
| Fab 21 phase 1, Phoenix | N4 | Volume since late 2024; first US Blackwell wafer October 2025 | Made in US |
| Fab 21 phase 2, Phoenix | N3 | Tools moving in; volume scheduled for the third quarter of 2027 | US planned |
| Fab 21 phase 3, Phoenix | N2, A16 | Construction; later this decade | US planned |
| Arizona advanced packaging | CoWoS, SoIC | Planned; no production date | US planned |
| JASM, Kumamoto | 12 to 28nm; 3nm in fab 2 | Fab 1 operating; fab 2 volume planned for 2028 | Made abroad |
| ESMC, Dresden | 12 to 28nm | Construction; production from 2027 | Made abroad |
| TSMC Nanjing | 16nm, 28nm | Operating under a 2026 US annual license | Made abroad |
| Placeholder: remaining TSMC rows from the fab dataset (Fab 12, Fab 14, Fab 15, AP6, AP7, Sony-TSMC Koshi) | |||
TSMC has committed $165 billion to Arizona: six fabs, two advanced packaging plants and a research center. When it is complete, TSMC expects about 30% of its 2nm and more advanced capacity to be in Arizona. Today that site makes only 4nm, one of the four leading-edge node families above, and the first 3nm fab there is about a year from volume. Japan's second fab moved from 6nm to 3nm, with volume planned for 2028, and Germany's ESMC is a mature-node fab for car and industrial chips.
CoWoS packaging
Every CoWoS Package Is Still Assembled in Taiwan
CoWoS, TSMC's chip-on-wafer-on-substrate packaging, joins an AI processor to its HBM memory stacks on a silicon interposer. Capacity averaged about 96,000 wafers a month in 2026 and is expected to reach about 130,000 by the end of 2026 and about 260,000 by the end of 2028 (TrendForce, September 2026). NVIDIA takes close to 60% of it. All of that capacity is in Taiwan, at AP6 in Zhunan, AP7 in Chiayi and the Taichung CoWoS lines.
That makes Arizona wafers a round trip. Blackwell wafers made at Fab 21 since October 2025 ship back to Taiwan for CoWoS assembly. The first US option is Amkor's Peoria, Arizona plant, which is set to package TSMC Arizona wafers from early 2028; TSMC's own Arizona packaging plants have no production date. Detail is on CoWoS.
In the chip rings
TSMC Is in All 10 Chips the Site Tracks
- Made in US
- Some US volume
- US planned
- Made abroad
| Chip | What TSMC supplies | US status |
|---|---|---|
| NVIDIA Blackwell Ultra B300 | Logic die (4NP, Tainan and Arizona), interposer, CoWoS-L packaging | Some US volume |
| NVIDIA Rubin | Logic die (N3P), HBM4 base die for SK hynix, CoWoS-L packaging | Made abroad |
| AMD Instinct MI455X | Compute dies (N2), base and I/O dies (N3P), SoIC and CoWoS-L | Made abroad |
| Google TPU Ironwood | Logic die (N3P), CoWoS packaging | Made abroad |
| AWS Trainium3 | Logic die (N3P), CoWoS-R packaging | Made abroad |
| Microsoft Maia 200 | Logic die (3nm), CoWoS packaging | Made abroad |
| Tesla AI5 | Second-source logic die, Arizona and Taiwan | US planned |
| Huawei Ascend 910C | Some 7nm dies made before the 2024 cutoff, per teardown | Made abroad |
| SK hynix HBM4 | Base die (12nm class) | Made abroad |
| Apple A19 Pro | Logic die (N3P), InFO packaging | Made abroad |
| Placeholder: per-chip rows from sx_chip_rings (supplier like 'TSMC%') | ||
Every one of the 10 chips in the site's supplier rings has a TSMC part in it, including the memory: SK hynix's HBM4 stack sits on a TSMC base die. The only US volume in those 80 supplier rows is the B300 logic die at Fab 21. The full matrix is on Chip Supplier Rings.
Its suppliers
TSMC Cannot Route Around ASML or Japanese Resist
TSMC's own dependencies are narrower than its customers' dependence on it, but they are absolute in two places. Every EUV layer runs on an ASML scanner, and TSMC is ASML's largest EUV customer. Japanese suppliers make about 95% of EUV resist and most 300mm wafers. Toolmakers and their US build sites are on Wafer Fab Equipment and ASML EUV Scanner; resist and wafers are on Photoresist and Wafer Production.
China
China Exposure Is One Mature Fab and a Closed Customer List
- Nanjing: TSMC's only China fab makes 16nm and 28nm wafers. Its validated end-user status, which let US tools ship without individual licenses, lapsed on December 31, 2025; the US granted an annual license for 2026 that covers operation and maintenance.
- Customers: TSMC stopped shipping to Huawei in September 2020. A TSMC-made die found in an Ascend AI processor in 2024 traced to orders placed through Sophgo, and TSMC halted those shipments. Chinese AI chips now run mainly at SMIC; see Huawei and HiSilicon.
- Controls: TSMC screens advanced-node orders from China against US rules on transistor count and HBM, covered on Process Design Kits.
Cost of spreading out
Overseas Fabs Cost TSMC Two Points of Margin
Spreading out costs margin. TSMC's chief financial officer put the gross-margin drag from overseas fabs at close to two points in 2026, widening to three to four points over the next several years as more Arizona fabs open. Capital spending for 2026 is budgeted at $60 billion to $64 billion, of which $40.6 billion was spent in the first nine months, and the company says 2026 to 2028 spending will significantly exceed the previous three years. Fourth-quarter 2026 revenue is guided at $52.3 billion to $54.3 billion.
Record
Page Record
- Covers
- TSMC node mix and revenue, sites by node and US status, Arizona, Japan and Germany expansion, CoWoS capacity and location, role in the site's chip supplier rings, tool and material dependencies, China exposure and overseas cost
- Sources
- TSMC third-quarter 2026 results and management report (October 2026); TSMC earnings call coverage, XenoSpectrum (October 2026); TSMC Arizona $165 billion announcement (March 2025); Nikkei via EMSNow on Arizona fab 2 (December 2025); TrendForce CoWoS capacity (September 2026); The Standard on the Nanjing annual license (January 1, 2026); SemiconductorX fab dataset and chip supplier rings (October 2026)
- Last verified
- October 2026