Top Merchant OSATs

ASE · Amkor · JCET · outsourced assembly and test

ASE took in $18.5 billion in 2024, nearly three times Amkor's $6.3 billion, and four of the ten largest OSATs are Chinese. Amkor is the only US-headquartered company in the top ten, and its Peoria, Arizona campus, producing from early 2028 under a 10-year TSMC agreement, will be the first large merchant advanced packaging plant in the United States.

Top 10 OSATs by 2024 revenue: ASE $18.54 billion, Amkor $6.32 billion, JCET $5.00 billion, Tongfu $3.32 billion, Powertech $2.28 billion, HT-Tech $2.01 billion, Wise Road $1.56 billion, Hana Micron $0.92 billion, KYEC $0.91 billion, ChipMOS $0.71 billion. Amkor is the only US-headquartered company; four are Chinese. TOP 10 OSATS BY REVENUE, 2024 ($ BILLION) 0 5 10 15 20 ASE 18.54 Amkor 6.32 JCET 5.00 Tongfu 3.32 Powertech 2.28 HT-Tech (Huatian) 2.01 Wise Road (UTAC) 1.56 Hana Micron 0.92 KYEC 0.91 ChipMOS 0.71 Taiwan United States China South Korea SOURCE: TRENDFORCE, MAY 2025. ASE REVENUE INCLUDES ITS USI ELECTRONICS ARM.
ASE 2024 revenue
$18.5B
Amkor 2024 revenue
$6.3B
JCET 2024 revenue
$5.0B
Chinese firms in top 10
4
ASE capex, 2026
$10.5B
Hub
Fabs

The three leaders

ASE, Amkor and JCET

An OSAT (outsourced semiconductor assembly and test company) packages and tests chips for designers and foundries that do not run their own back end. The three largest each offer everything from wire-bond packages to fan-out and 2.5D.

Tier 1 merchant OSATs
Operator (HQ)Main plantsPosition
ASE Technology (Kaohsiung, Taiwan)Kaohsiung and Chungli, Taiwan; SPIL in Taichung; China; South Korea; Japan; Malaysia; Singapore; ISE Labs test in Fremont, CaliforniaLargest OSAT; owns SPIL since 2018; 2026 capex raised to $10.5 billion; targets more than $3.5 billion in leading-edge advanced packaging revenue in 2026
Amkor Technology (Tempe, Arizona)Incheon, South Korea (largest); the Philippines; Vietnam; Malaysia; Japan; China; Taiwan; Portugal; Peoria, Arizona from 2028Only US-headquartered OSAT in the top ten; strong in automotive; packages for Apple and NVIDIA; 10-year advanced packaging agreement with TSMC in Arizona (June 2026)
JCET Group (Jiangyin, China)Jiangyin and other Chinese sites; South Korea and Singapore through STATS ChipPAC, acquired in 2015Largest Chinese OSAT; revenue up 19% in 2024; advanced packaging is most of its revenue mix; main partner for Chinese chip designers

Top 10 OSATs

Top 10 OSATs by Revenue

The ten largest OSATs took in $41.6 billion in 2024, up 3%. Chinese firms grew fastest: HT-Tech (Huatian) rose 26% and JCET 19%. KYEC, a test specialist, was the only one to shrink by more than 10%.

Top 10 OSATs, 2024 (TrendForce)
CompanyHQRevenueChange
ASETaiwan$18.54Bn/a
AmkorUnited States$6.32B-2.8%
JCETChina$5.00B+19.3%
Tongfu MicroelectronicsChina$3.32B+5.6%
Powertech TechnologyTaiwan$2.28B+1.0%
HT-Tech (Huatian)China$2.01B+26.0%
Wise Road (UTAC)China and Singapore$1.56B+5.0%
Hana MicronSouth Korea$0.92B+23.7%
KYECTaiwan$0.91B-14.5%
ChipMOSTaiwan$0.71B+3.1%

Where they operate

ASE and Amkor Spread Across Asia; JCET Stays Mostly in China

TAIWAN CHINA SOUTH KOREA JAPAN MALAYSIA SINGAPORE PHILIPPINES VIETNAM PORTUGAL US ASE Amkor JCET Operating plants Planned (Amkor Peoria, Arizona, 2028)

ASE's process development stays in Taiwan; the company says it will expand into the US when the timing is right, and its SPIL unit is in final planning for an Arizona test plant. Amkor's largest capacity is in Korea, and Arizona will be its first US production. JCET's plants outside China came with STATS ChipPAC.

Advanced packaging race

OSATs Now Take CoWoS Overflow From TSMC

TSMC's OSAT partners add 50,000 to 60,000 CoWoS-class wafers a month in 2026, alongside TSMC's own 120,000 to 140,000. ASE plans to triple its CoWoS-equivalent capacity to 25,000 wafers a month, and SPIL began building a CoWoS plant in Douliu in August 2026. Amkor is expanding interposer capacity in Korea by more than 300% by the end of 2028 for NVIDIA.

  • ASE: FOCoS (fan-out chip on substrate) and FOCoS-Bridge compete with bridge-based 2.5D from the foundries.
  • Amkor: SWIFT and SLIM fan-out and RDL interposer platforms for networking, mobile and AI.
  • JCET: XDFOI fan-out chiplet packaging for Chinese AI and networking designers.

Architecture detail is on Advanced Packaging and CoWoS.

Flagship plants

Flagship Merchant OSAT Plants

  • Made in US
  • US planned
  • Made abroad
Merchant OSAT flagship plants
FacilityOperatorLocationOutputStatusUS status
Amkor Arizona (Peoria)Amkor TechnologyPeoria, ArizonaAdvanced packaging and test for TSMC Arizona wafersConstructionUS planned
Amkor Korea (Advanced Packaging)Amkor TechnologyIncheon, South KoreaAdvanced packaging for mobile, AIOperational/ExpandingMade abroad
ASE Kaohsiung (Advanced Packaging)ASE GroupKaohsiung, TaiwanOSAT advanced packagingOperational/ExpandingMade abroad
JCET Jiangyin (OSAT)JCET GroupJiangyin, ChinaOSAT for Chinese chip supply chainOperationalMade abroad
SPIL DouliuSiliconware Precision Industries (SPIL)Douliu, TaiwanAI accelerator packagingConstructionMade abroad
SPIL Taichung (OSAT)Siliconware Precision Industries (SPIL)Taichung, TaiwanAdvanced packaging for Apple, autoOperationalMade abroad

Reshoring

Amkor Arizona Anchors US Merchant Packaging

Amkor's Peoria campus sits on 104 acres in the Peoria Innovation Core, with another 67 acres secured next to it. Production starts in early 2028 and full capacity is expected by 2030. The June 2026 agreement makes Amkor TSMC's main US packaging and test partner, so chips made at TSMC Arizona can be packaged without flying to Taiwan. TrendForce reports Amkor's planned Arizona spending at up to $12 billion.

Europe has little merchant OSAT capacity beyond Amkor's plant in Vila do Conde, Portugal. China's three largest OSATs, JCET, Tongfu and Huatian, play no part in US reshoring.

Record

Dataset Record

Dataset
Merchant OSAT rows of the SemiconductorX fab dataset (fabs2026)
Sources
TrendForce OSAT ranking (May 2025) and Arizona packaging report (September 2026); ASE capex reporting (2026); Amkor and NVIDIA releases; JCET annual report
Last verified
October 2026