Six layers
Six Layers of Silicon in a Humanoid
A production humanoid with about 40 degrees of freedom carries roughly 1,100 to 1,500 electronic parts: 800 to 1,200 passives and about 260 to 530 active semiconductors. The same parts serve robotaxis, warehouse robots, cobots and drones, but humanoids set the ceiling, with the most joints and the tightest size, weight and power limits.
| Layer | Function | Devices | Per robot | Leading suppliers | Supply risk |
|---|---|---|---|---|---|
| Joint motor drive | Three-phase inverter per joint for about 40 brushless motors | GaN half-bridges, gate drivers, shunts | 80 to 160 GaN devices | Infineon (with GaN Systems), Texas Instruments, EPC; Innoscience in China | Medium |
| Battery management | Monitors, protects and balances the lithium-ion pack | Cell monitor AFEs, coulomb counters, protection ICs, BMS MCU | 4 to 12 ICs | Texas Instruments (BQ), Analog Devices (LTC) | High |
| Compute power delivery | Steps the 48 to 96V bus down to sub-1V SoC rails | DC-DC controllers, multiphase VRs, PMICs, LDOs | 8 to 20 ICs | TI, Analog Devices, Renesas, Infineon, Monolithic Power Systems | Medium |
| Position sensing | Rotor angle at each joint to close the motor loop | Magnetic and inductive encoder ICs | 40 to 60 ICs | ams-OSRAM (AS5047P), Texas Instruments (TMAG5170); Novosense in China | Critical |
| Inertial sensing | Balance and motion estimation | Six-axis MEMS IMUs | 3 to 8 | Bosch Sensortec (BMI088), Analog Devices (ADIS) | High |
| Force-torque sensing | Contact force at wrists and ankles | Strain gauge assemblies with instrumentation amplifiers and 24-bit ADCs; no MEMS force-torque IC in production | 2 to 6 sensors | TI and ADI signal chain; ATI, Bota Systems, in-house bodies | Critical |
| Inference compute | Perception, planning and whole-body control | AI SoC with LPDDR5X and NAND | 1 or 2 SoCs | Tesla in-house chips, NVIDIA Jetson Thor; Horizon Robotics, Rockchip and Huawei Ascend in China | Medium |
Power and signal
Most Chips Sit in the Joints
Analog and mixed-signal parts outnumber digital compute parts by about 20 to 50 times by unit count. The encoder ICs, 40 to 60 per robot, are the highest-count single risk; the GaN switches, 80 to 160 per robot, are the highest-count power devices. A robot maker that grew out of AI software runs, at scale, an analog procurement business.
Compute
The AI Processor: One or Two per Robot
The inference SoC is the most expensive part in the bill of materials and the most covered, but each robot carries one or two. It runs perception, language and whole-body control at under 10 milliseconds per cycle, with LPDDR5X working memory and NAND for model storage, inside a sealed body with little airflow.
| Platform | What it is | Used by |
|---|---|---|
| NVIDIA Jetson Thor | Blackwell GPU, up to 2,070 FP4 TFLOPS, 128GB LPDDR5X; shipping since August 2025 | Early adopters named by NVIDIA include Agility Robotics, Boston Dynamics and Figure |
| Tesla in-house chips | FSD-class inference chips designed by Tesla, made at TSMC and Samsung | Optimus |
| Qualcomm robotics SoCs | Snapdragon-based robotics platforms | Service and industrial robots |
| Chinese SoCs | Horizon Robotics, Rockchip RK3588 class, Huawei Ascend where NVIDIA is restricted | Unitree, UBTech, AgiBot and others |
Most fleets train in the cloud and push compact models to robots over the air during charging, the same loop autonomous vehicles use; see Edge AI SoCs.
Production
Chinese Makers Ship Nearly All Humanoids
Counterpoint counted more than 22,000 humanoids shipped in the first half of 2026, up nearly 300% from a year earlier. AgiBot and Unitree shipped about three-quarters of them.
- US-based maker
- Abroad
| Maker | Home | Units | Share |
|---|---|---|---|
| AgiBot | China | About 9,700 | 43%+ |
| Unitree | China | 7,000+ | 31% |
| Galbot | China | 1,100+ | About 5% |
| UBTech | China | 1,000+ | 4.4% |
| Leju Robotics | China | About 650 | 2.9% |
| Tesla Optimus | United States | Internal only; no customer units | - |
| Figure, Agility, Boston Dynamics, 1X | United States and Norway | Pilot deployments | - |
Tesla says Optimus V3 is ready for mass production on lines being built at Fremont; robots coming off them are used inside Tesla, with output reported at several hundred a week by August 2026. Optimus 4 will be built at a new Optimus factory at Giga Texas, planned for about 10 million robots a year, 10 times the Fremont line's 1 million; Tesla expects production there to start around summer 2027. Hyundai plans to deploy Boston Dynamics' electric Atlas at its Georgia Metaplant.
Fleet demand
Chip Demand at Fleet Scale
| Layer | Per robot | 10K robots a year | 100K a year | 1M a year | First constraint |
|---|---|---|---|---|---|
| GaN motor drive | 80 to 160 | 800K to 1.6M | 8M to 16M | 80M to 160M | GaN-on-silicon wafer allocation at 100K robots a year |
| BMS ICs | 4 to 12 | 40K to 120K | 400K to 1.2M | 4M to 12M | Competes with EV BMS programs for TI and ADI supply |
| PMICs | 8 to 20 | 80K to 200K | 800K to 2M | 8M to 20M | Multiphase VRs compete with AI server programs |
| Position encoders | 40 to 60 | 400K to 600K | 4M to 6M | 40M to 60M | Catalog allocation runs out between 10K and 50K robots a year |
| IMUs | 3 to 8 | 30K to 80K | 300K to 800K | 3M to 8M | BMI088 competes with automotive ADAS demand |
| Force-torque sensors | 2 to 6 | 20K to 60K | 200K to 600K | 2M to 6M | Instrument makers cannot reach 10K robots a year |
Bottlenecks
Humanoid Semiconductor Bottlenecks
| Bottleneck | Layer | 2026 | 2029 | Path out |
|---|---|---|---|---|
| No MEMS force-torque IC | Force-torque | Critical | High | A three- to seven-year MEMS program; Bosch or STMicroelectronics most likely; none announced |
| ams-OSRAM encoder concentration | Position sensing | High | High | TI TMAG5170 ecosystem, Melexis qualification, Novosense in China |
| Bosch BMI088 single source | Inertial | High | Medium-high | Murata SCHA634 as an automotive-grade alternative |
| GaN-on-silicon capacity | Motor drive | Low-medium | Medium-high | TI GaN in Dallas and Aizu, Infineon 300mm GaN at Villach, Innoscience in China; TSMC exits GaN by July 2027 |
| TI and ADI BMS duopoly | Battery | Medium | Medium | Renesas and NXP add limited diversity |
| No volume tactile skin | Hands | Critical | Critical | Flexible substrates fall outside standard IC manufacturing |
Suppliers
Texas Instruments and Analog Devices Span the Most Layers
Four decades of precision analog process work put TI and Analog Devices in more humanoid layers than any other supplier, and both make most of those parts in their own US fabs.
- Made in US
- Some US volume
- Made abroad
| Supplier | Layers | Home | Fab model |
|---|---|---|---|
| Texas Instruments | Motor drive, BMS, PMIC, encoders, signal chain | United States | Own fabs; GaN in Dallas, Texas and Aizu, Japan; 300mm analog in Texas and Utah |
| Analog Devices | BMS, PMIC, tactical IMUs, signal chain | United States | Own fabs plus TSMC and GlobalFoundries; MEMS in Wilmington, Massachusetts |
| Infineon | GaN motor drive, VRs | Germany | Own fabs (Villach, Kulim) plus foundry |
| Bosch Sensortec | IMUs | Germany | Own MEMS fab, Reutlingen |
| ams-OSRAM | Encoders | Austria | Fabless for encoders (TSMC) |
| Renesas | BMS, VRs | Japan | Own fabs plus foundry |
| STMicroelectronics | BMS, PMIC, IMUs, MCUs | France and Italy | Own fabs (Agrate, Crolles) |
| Monolithic Power Systems | 48V PMICs and VRs | United States | Fabless (TSMC) |
Two supply chains
Western and Chinese Robots Are Splitting Their Supply Chains
Western programs (Tesla Optimus, Figure, Agility, Boston Dynamics, 1X) and Chinese programs (Unitree, UBTech, AgiBot, Fourier, Xiaomi) are building parallel supply chains. The split is incomplete: Chinese robots still balance on Bosch's BMI088.
| Layer | Western programs | Chinese programs | Split |
|---|---|---|---|
| GaN motor drive | Infineon, TI, EPC | Innoscience, Sanan IC | Active |
| BMS ICs | TI BQ, ADI LTC | TI and ADI; BYD Microelectronics captive | Incomplete |
| PMIC | TI, ADI, Renesas, Infineon, MPS | Southchip, Silergy on secondary rails | Partial |
| Position encoders | ams-OSRAM, TI | Novosense NSM2116 | Active |
| IMUs | Bosch BMI088, ADI | Bosch BMI088 for balance; ACEINNA, Senodia elsewhere | Blocked until about 2028 |
| Inference SoC | NVIDIA, Tesla, Qualcomm | Horizon Robotics, Rockchip, Huawei Ascend; NVIDIA where allowed | Active and widening |
Qualification
Design Choices Now Set Supply for Years
Validating a new part in a safety-critical joint takes 12 to 24 months, and humanoids have no equivalent of the automotive AEC-Q100 and ISO 26262 regime, so each maker writes its own. Moving an encoder from ams-OSRAM to TI takes three to six months of firmware and angle-error work; swapping a BMI088 means retuning the balance controller. Parts chosen in the 2025 to 2027 design phase will set supply for three to five years of production, and second sources are cheapest to add before the first production run.
Record
Page Record
- Covers
- The humanoid semiconductor stack, chip counts, compute, production, fleet demand, bottlenecks, suppliers and the West-China split; absorbs the former Humanoid Compute Stack page
- Sources
- Counterpoint humanoid shipments (August 2026) via Forbes; Tesla shareholder letter (October 2026); NVIDIA Jetson Thor specifications; supplier datasheets (TI, ADI, Infineon, ams-OSRAM, Bosch); SemiconductorX device-count model
- Last verified
- October 2026