Three zones
Transistors First, Then Contacts, Then Wiring
A polished wafer enters the fab and leaves three to four months later fully patterned, after 500 to 1,000 process steps and about 90 mask exposures at 3nm. The work is built from the bottom up in three zones. Front-end-of-line (FEOL) builds the transistors in the silicon itself. Middle-of-line (MOL) builds the contacts down to each transistor. Back-end-of-line (BEOL) builds the stack of copper wiring above them.
Every patterned layer in all three zones is made by the same loop: clean, deposit, pattern, etch, clean again and measure. A leading-edge logic chip runs that loop 80 to 120 times. The loop itself, and how front-end fits with wafer sort, assembly and modules, is on Manufacturing Process Flow. The wiring zone has its own page, Back-End-of-Line (BEOL).
Step inventory
Five of 10 Step Families Have Chinese Toolmakers in Volume
Ten step families make up the front end. Five of them, cleaning, oxidation, deposition, etch and CMP, already have Chinese toolmakers shipping in volume to SMIC, Hua Hong, CXMT and YMTC. Implant, coat and develop, and metrology have Chinese entrants at an early stage. EUV lithography has none: ASML is the only maker, and EUV scanners cannot be exported to China.
| Step | Purpose | How often | Leading toolmakers | China domestic |
|---|---|---|---|---|
| Wafer cleaning | Remove particles, residues and films | Before and after nearly every step | SCREEN, TEL, Lam Research, SEMES | ACM Research, Naura |
| Oxidation | Grow silicon dioxide for isolation and gate layers; anneal | Selective, transistor layers | TEL, Kokusai Electric, ASM International | Naura |
| Doping and ion implantation | Put dopant atoms into the silicon to set conductivity | Selective, transistor layers | Applied Materials, Axcelis | Kingstone (early) |
| Thin-film deposition | Lay down oxides, nitrides and metals by CVD, PVD, ALD and epitaxy | Every loop pass | Applied Materials, Lam Research, TEL, ASM International | Naura, Piotech, AMEC |
| Photoresist and development | Coat, bake and develop the light-sensitive resist | Every lithography pass | TEL (coater-developer tracks) | Kingsemi (early) |
| Photolithography | Print the mask pattern into the resist | About 90 masks at 3nm | ASML (sole EUV source; most DUV), Nikon, Canon | SMEE (DUV only) |
| Etching | Remove material where the resist is open | Every loop pass | Lam Research, TEL, Applied Materials | AMEC, Naura |
| Planarization (CMP) | Polish the wafer flat before the next layer | Most passes, every metal layer | Applied Materials, Ebara | Hwatsing |
| Metallization | Fill contacts and wiring with tungsten, cobalt, copper or molybdenum | Every metal layer | Applied Materials, Lam Research | Naura (PVD), ACM Research (plating) |
| Metrology and inspection | Measure and inspect each layer before the next | Every loop pass | KLA, Applied Materials, Hitachi High-Tech, Onto Innovation | Skyverse (early) |
Resist strip, the ash or wet clean that removes resist after etch, runs once per lithography pass and is covered with Photoresist and Development. Tool categories, market shares and models are on the Equipment pages.
Wafers and masks
Two Inputs Arrive Before Any Step Runs
Two inputs arrive at the fab dock before any step can run, and neither touches open cleanroom air once inside.
- Wafers: polished prime, epitaxial, silicon-on-insulator (SOI) or compound wafers, shipped in sealed front-opening shipping boxes. Shin-Etsu Chemical and SUMCO make about half of the world's 300mm silicon wafers; GlobalWafers, Siltronic and SK Siltron make most of the rest. See Wafer Production.
- Photomasks: quartz plates, or reflective plates on EUV mask blanks, shipped in reticle pods with pellicles fitted. Leading foundries make their own masks; Photronics, Toppan and DNP supply the merchant market. See Photomasks and Reticles.
Inside the fab an automated material handling system (AMHS) moves each lot of 25 wafers between tools in sealed carriers, and the manufacturing execution system (MES) decides which tool runs it next.
Cost by node
Each Node Adds Masks, Steps and Weeks
Each node step adds masks, process steps and weeks. Multi-patterning and extra inspection grow faster than the shrink itself, so front-end cost per wafer rises at every node even as cost per transistor falls more slowly than it used to.
| Node | Mask layers | Process steps | Fab cycle time |
|---|---|---|---|
| 28nm | About 40 | About 350 | About eight weeks |
| 14nm and 10nm | About 55 | About 550 | About 10 weeks |
| 7nm | About 70 | About 700 | About 12 weeks |
| 5nm | About 80 | About 850 | About 13 weeks |
| 3nm | About 90 | About 1,000 | About 14 weeks |
| 2nm (GAA) | More than 90 | More than 1,000 | About 16 weeks |
Node names, transistor types and who makes what at each node are on Process Nodes.
Tool spending
Equipment Spending Is Heading Past $200 Billion
SEMI expects wafer fab equipment (WFE) sales of $143.9 billion in 2026, up 23% on the 2025 record of $116.9 billion, and more than $200 billion by 2028. Five companies, ASML, Applied Materials, Lam Research, Tokyo Electron (TEL) and KLA, take most of that spending.
| Bottleneck | Concentration | Effect |
|---|---|---|
| EUV scanners | ASML only; 44 low-NA EUV systems shipped in 2025, about 65 planned for 2026; high-NA EXE:5200B in early production use | Sets the ceiling on how fast leading-edge capacity can grow anywhere |
| Leading-edge geography | TSMC's 7nm-and-below nodes were 79% of its wafer revenue in the third quarter of 2026, almost all from Taiwan fabs | A Taiwan Strait disruption would cut most advanced logic supply |
| Inspection and metrology | KLA leads optical and e-beam inspection by a wide margin | Yield ramps at new nodes wait on inspection capacity |
| Fab capital | A leading-edge logic fab costs $20 billion or more and takes three to five years | No leading-edge shortage clears faster than a fab can be built |
| Utilities | A large leading-edge fab draws tens to hundreds of megawatts and millions of gallons of ultrapure water a day | Sites now follow power and water; see Energy and Water |
The cross-industry view is on the Bottleneck Atlas.
Leading-edge sites
Two US Fabs Run Leading-Edge Wafers Today
Leading-edge front-end work sits in a handful of fabs. Two US sites, Intel Fab 52 and TSMC Fab 21, run leading-edge wafers today; Samsung Taylor and the later Arizona phases are next.
- Made in US
- US planned
- Made abroad
| Site | Location | Makes | Status | US status |
|---|---|---|---|---|
| TSMC Fab 20 and Fab 22 | Hsinchu and Kaohsiung, Taiwan | N2 in volume since late 2025; A16 next | Operating, ramping | Made abroad |
| TSMC Fab 18 | Tainan, Taiwan | N5 and N3 | Operating | Made abroad |
| Samsung Hwaseong and Pyeongtaek | Gyeonggi, South Korea | SF3 and SF2 | Operating | Made abroad |
| Rapidus IIM-1 | Chitose, Japan | 2nm pilot line, volume about 2027 | Pilot | Made abroad |
| Intel Fab 52 | Chandler, AZ | Intel 18A, about 30,000 wafers a month (reported) | Operating | Made in US |
| TSMC Fab 21 phase 1 | Phoenix, AZ | N4 | Operating | Made in US |
| Samsung Taylor | Taylor, TX | SF2 for Tesla AI5 and AI6 | Ramping | US planned |
| TSMC Fab 21 phases 2 and 3 | Phoenix, AZ | N3 from 3Q 2027; N2 and A16 later | Construction | US planned |
| Placeholder: remaining leading-edge rows from the fab dataset | ||||
Every fab by type and status is on Global Fabs and Leading-Edge Logic Fabs.
Fab metrics
Defect Density Decides the Cost of a Good Die
| Metric | Benchmark | Why it matters |
|---|---|---|
| Wafer starts per month | Large 300mm fabs run 100,000 or more | The standard capacity unit for fab sizing and spending |
| Defect density (D0) | About 0.1 to 0.2 defects per square centimeter for a mature process; Intel 18A was reported in that range in July 2026 | Sets yield, and so cost per good die |
| Tool uptime | Above 90% for EUV; above 95% for mature DUV | One EUV tool down can hold output across several product lines |
| Cycle time | Eight to 16 weeks by node | How fast a design change reaches volume |
| Mature yield | High 80s to high 90s percent by node and die size | New nodes start at 50 to 70% and take 12 to 24 months to mature |
Record
Page Record
- Covers
- Front-end zones, step families, toolmakers and Chinese substitutes, node complexity, equipment spending, leading-edge sites and fab metrics
- Sources
- SEMI equipment forecast (July 2026); TSMC 3Q 2026 results (October 2026); ASML via Crypto Briefing (low-NA EUV units, July 2026); TechSpot citing BlueFin Research (Intel 18A, July 2026); SemiconductorX fab dataset (October 2026); vendor disclosures for Chinese toolmakers
- Last verified
- October 2026