Front-End Fabrication

FEOL, MOL and BEOL · 10 step families · 500 to 1,000 steps per wafer

Front-end fabrication builds the transistors and wiring on the wafer and carries most of a chip's manufacturing cost. Each step family has two to four leading toolmakers, and China now has its own suppliers in volume for five of them; EUV lithography has one maker, ASML, and no substitute.

Who makes the tools for each front-end step. Cleaning, oxidation, deposition, etch and CMP each have two to four leading toolmakers and a Chinese supplier in volume. Ion implant, coat and develop and metrology have two to four leaders and Chinese suppliers at an early stage. EUV lithography has one maker, ASML, and no Chinese alternative. FRONT-END STEP LEADING TOOLMAKERS CHINA DOMESTIC Cleaning SCREEN, TEL, Lam, SEMES ACM Research, Naura IN VOLUME Oxidation, anneal TEL, Kokusai, ASM Naura IN VOLUME Deposition Applied, Lam, TEL, ASM Naura, Piotech, AMEC IN VOLUME Etch Lam, TEL, Applied AMEC, Naura IN VOLUME CMP Applied, Ebara Hwatsing IN VOLUME Ion implant Applied, Axcelis Kingstone EARLY Coat and develop TEL Kingsemi EARLY Metrology KLA, Applied, Hitachi, Onto Skyverse EARLY EUV lithography ASML only None NONE GRAY TICKS: NUMBER OF LEADING TOOLMAKERS AT THE LEADING EDGE. CHINA STATUS FROM VENDOR DISCLOSURES AND INDUSTRY REPORTING, 2026.
Equipment spend, 2026
$143.9B (SEMI)
Steps per wafer
500 to 1,000
Masks at 3nm
About 90
EUV makers
One
US leading-edge fabs
Intel Fab 52, TSMC Fab 21
Hub
Process

Three zones

Transistors First, Then Contacts, Then Wiring

A polished wafer enters the fab and leaves three to four months later fully patterned, after 500 to 1,000 process steps and about 90 mask exposures at 3nm. The work is built from the bottom up in three zones. Front-end-of-line (FEOL) builds the transistors in the silicon itself. Middle-of-line (MOL) builds the contacts down to each transistor. Back-end-of-line (BEOL) builds the stack of copper wiring above them.

A chip in cross-section, built from the bottom up in three zones. Front-end-of-line (FEOL) builds the transistors in the silicon using oxidation, implant, deposition, lithography and etch. Middle-of-line (MOL) builds the contacts that connect transistors to the wiring. Back-end-of-line (BEOL) builds 10 to 20 metal layers of wiring, each patterned, etched, filled with metal and flattened by CMP. ONE CHIP, BUILT BOTTOM UP IN THREE ZONES SILICON WAFER BOND PADS BEOL Back-end-of-line: 10 to 20 metal layers DEPOSIT, PATTERN, ETCH, PLATE, CMP MOL Middle-of-line: contacts TUNGSTEN, COBALT, RUTHENIUM FEOL Front-end-of-line: transistors OXIDATION, IMPLANT, EPI, GATE, EUV NOT TO SCALE. UPPER METAL LAYERS ARE WIDER AND THICKER FOR POWER AND CLOCK.

Every patterned layer in all three zones is made by the same loop: clean, deposit, pattern, etch, clean again and measure. A leading-edge logic chip runs that loop 80 to 120 times. The loop itself, and how front-end fits with wafer sort, assembly and modules, is on Manufacturing Process Flow. The wiring zone has its own page, Back-End-of-Line (BEOL).

Step inventory

Five of 10 Step Families Have Chinese Toolmakers in Volume

Ten step families make up the front end. Five of them, cleaning, oxidation, deposition, etch and CMP, already have Chinese toolmakers shipping in volume to SMIC, Hua Hong, CXMT and YMTC. Implant, coat and develop, and metrology have Chinese entrants at an early stage. EUV lithography has none: ASML is the only maker, and EUV scanners cannot be exported to China.

Front-end process steps
StepPurposeHow oftenLeading toolmakersChina domestic
Wafer cleaningRemove particles, residues and filmsBefore and after nearly every stepSCREEN, TEL, Lam Research, SEMESACM Research, Naura
OxidationGrow silicon dioxide for isolation and gate layers; annealSelective, transistor layersTEL, Kokusai Electric, ASM InternationalNaura
Doping and ion implantationPut dopant atoms into the silicon to set conductivitySelective, transistor layersApplied Materials, AxcelisKingstone (early)
Thin-film depositionLay down oxides, nitrides and metals by CVD, PVD, ALD and epitaxyEvery loop passApplied Materials, Lam Research, TEL, ASM InternationalNaura, Piotech, AMEC
Photoresist and developmentCoat, bake and develop the light-sensitive resistEvery lithography passTEL (coater-developer tracks)Kingsemi (early)
PhotolithographyPrint the mask pattern into the resistAbout 90 masks at 3nmASML (sole EUV source; most DUV), Nikon, CanonSMEE (DUV only)
EtchingRemove material where the resist is openEvery loop passLam Research, TEL, Applied MaterialsAMEC, Naura
Planarization (CMP)Polish the wafer flat before the next layerMost passes, every metal layerApplied Materials, EbaraHwatsing
MetallizationFill contacts and wiring with tungsten, cobalt, copper or molybdenumEvery metal layerApplied Materials, Lam ResearchNaura (PVD), ACM Research (plating)
Metrology and inspectionMeasure and inspect each layer before the nextEvery loop passKLA, Applied Materials, Hitachi High-Tech, Onto InnovationSkyverse (early)

Resist strip, the ash or wet clean that removes resist after etch, runs once per lithography pass and is covered with Photoresist and Development. Tool categories, market shares and models are on the Equipment pages.

Wafers and masks

Two Inputs Arrive Before Any Step Runs

Two inputs arrive at the fab dock before any step can run, and neither touches open cleanroom air once inside.

  • Wafers: polished prime, epitaxial, silicon-on-insulator (SOI) or compound wafers, shipped in sealed front-opening shipping boxes. Shin-Etsu Chemical and SUMCO make about half of the world's 300mm silicon wafers; GlobalWafers, Siltronic and SK Siltron make most of the rest. See Wafer Production.
  • Photomasks: quartz plates, or reflective plates on EUV mask blanks, shipped in reticle pods with pellicles fitted. Leading foundries make their own masks; Photronics, Toppan and DNP supply the merchant market. See Photomasks and Reticles.

Inside the fab an automated material handling system (AMHS) moves each lot of 25 wafers between tools in sealed carriers, and the manufacturing execution system (MES) decides which tool runs it next.

Cost by node

Each Node Adds Masks, Steps and Weeks

Each node step adds masks, process steps and weeks. Multi-patterning and extra inspection grow faster than the shrink itself, so front-end cost per wafer rises at every node even as cost per transistor falls more slowly than it used to.

Front-end complexity by node (industry estimates)
NodeMask layersProcess stepsFab cycle time
28nmAbout 40About 350About eight weeks
14nm and 10nmAbout 55About 550About 10 weeks
7nmAbout 70About 700About 12 weeks
5nmAbout 80About 850About 13 weeks
3nmAbout 90About 1,000About 14 weeks
2nm (GAA)More than 90More than 1,000About 16 weeks

Node names, transistor types and who makes what at each node are on Process Nodes.

Tool spending

Equipment Spending Is Heading Past $200 Billion

SEMI expects wafer fab equipment (WFE) sales of $143.9 billion in 2026, up 23% on the 2025 record of $116.9 billion, and more than $200 billion by 2028. Five companies, ASML, Applied Materials, Lam Research, Tokyo Electron (TEL) and KLA, take most of that spending.

Front-end supply bottlenecks
BottleneckConcentrationEffect
EUV scannersASML only; 44 low-NA EUV systems shipped in 2025, about 65 planned for 2026; high-NA EXE:5200B in early production useSets the ceiling on how fast leading-edge capacity can grow anywhere
Leading-edge geographyTSMC's 7nm-and-below nodes were 79% of its wafer revenue in the third quarter of 2026, almost all from Taiwan fabsA Taiwan Strait disruption would cut most advanced logic supply
Inspection and metrologyKLA leads optical and e-beam inspection by a wide marginYield ramps at new nodes wait on inspection capacity
Fab capitalA leading-edge logic fab costs $20 billion or more and takes three to five yearsNo leading-edge shortage clears faster than a fab can be built
UtilitiesA large leading-edge fab draws tens to hundreds of megawatts and millions of gallons of ultrapure water a daySites now follow power and water; see Energy and Water

The cross-industry view is on the Bottleneck Atlas.

Leading-edge sites

Two US Fabs Run Leading-Edge Wafers Today

Leading-edge front-end work sits in a handful of fabs. Two US sites, Intel Fab 52 and TSMC Fab 21, run leading-edge wafers today; Samsung Taylor and the later Arizona phases are next.

  • Made in US
  • US planned
  • Made abroad
Leading-edge front-end sites
SiteLocationMakesStatusUS status
TSMC Fab 20 and Fab 22Hsinchu and Kaohsiung, TaiwanN2 in volume since late 2025; A16 nextOperating, rampingMade abroad
TSMC Fab 18Tainan, TaiwanN5 and N3OperatingMade abroad
Samsung Hwaseong and PyeongtaekGyeonggi, South KoreaSF3 and SF2OperatingMade abroad
Rapidus IIM-1Chitose, Japan2nm pilot line, volume about 2027PilotMade abroad
Intel Fab 52Chandler, AZIntel 18A, about 30,000 wafers a month (reported)OperatingMade in US
TSMC Fab 21 phase 1Phoenix, AZN4OperatingMade in US
Samsung TaylorTaylor, TXSF2 for Tesla AI5 and AI6RampingUS planned
TSMC Fab 21 phases 2 and 3Phoenix, AZN3 from 3Q 2027; N2 and A16 laterConstructionUS planned
Placeholder: remaining leading-edge rows from the fab dataset

Every fab by type and status is on Global Fabs and Leading-Edge Logic Fabs.

Fab metrics

Defect Density Decides the Cost of a Good Die

Front-end performance metrics
MetricBenchmarkWhy it matters
Wafer starts per monthLarge 300mm fabs run 100,000 or moreThe standard capacity unit for fab sizing and spending
Defect density (D0)About 0.1 to 0.2 defects per square centimeter for a mature process; Intel 18A was reported in that range in July 2026Sets yield, and so cost per good die
Tool uptimeAbove 90% for EUV; above 95% for mature DUVOne EUV tool down can hold output across several product lines
Cycle timeEight to 16 weeks by nodeHow fast a design change reaches volume
Mature yieldHigh 80s to high 90s percent by node and die sizeNew nodes start at 50 to 70% and take 12 to 24 months to mature

Record

Page Record

Covers
Front-end zones, step families, toolmakers and Chinese substitutes, node complexity, equipment spending, leading-edge sites and fab metrics
Sources
SEMI equipment forecast (July 2026); TSMC 3Q 2026 results (October 2026); ASML via Crypto Briefing (low-NA EUV units, July 2026); TechSpot citing BlueFin Research (Intel 18A, July 2026); SemiconductorX fab dataset (October 2026); vendor disclosures for Chinese toolmakers