Foveros Packaging

Intel · 3D die stacking · Foveros and Foveros Direct

Foveros stacks Intel's chiplets on an active base die, and every Intel client processor since Meteor Lake in 2023 is built on it. The Xeon 6+ Clearwater Forest, shown in March 2026, is Intel's first high-volume chip on Foveros Direct: 12 compute tiles on 18A bonded copper-to-copper at a 9 µm pitch onto three Intel 3 base tiles, stacked at Intel's Rio Rancho plant in New Mexico.

Intel Xeon 6+ Clearwater Forest in cross-section: 12 compute tiles on Intel 18A bonded copper-to-copper by Foveros Direct onto three Intel 3 base tiles, with two Intel 7 I/O tiles at the ends and EMIB bridges in the substrate linking the tiles. Foveros die-to-die pitch has shrunk from 50 µm on Lakefield to 36 µm on Meteor Lake and 9 µm on Clearwater Forest. INTEL XEON 6+ CLEARWATER FOREST, CROSS-SECTION ORGANIC SUBSTRATE I/O I/O BASE, INTEL 3 BASE, INTEL 3 BASE, INTEL 3 12 COMPUTE TILES, INTEL 18A Foveros Direct: copper-to-copper at 9 µm Compute tiles, Intel 18A Base tiles, Intel 3 I/O tiles, Intel 7 EMIB bridges DIE-TO-DIE PITCH, µm Lakefield, 2020 50 BUMP Meteor Lake, 2023 36 BUMP Clearwater Forest, 2026 9 HYBRID NOT TO SCALE. SOURCES: INTEL, MWC AND HOT CHIPS DISCLOSURES; TRENDFORCE, MARCH 2026.
First product
Lakefield, 2020
Client default since
Meteor Lake, 2023
Foveros Direct pitch
9 µm
First Direct product
Clearwater Forest
US Foveros
Rio Rancho, NM
Hub
Packaging

3D stacking

Dies Stacked on an Active Base Die

2.5D packaging (CoWoS, EMIB, I-Cube) places dies side by side. Foveros stacks them: an active base die carrying I/O, power delivery and often cache sits on the substrate, and compute and graphics tiles sit on top, joined through through-silicon vias (TSVs) in the base die.

  • Shorter wires: vertical links are micrometers long instead of millimeters, cutting delay and energy per bit.
  • Mixed nodes: each tile is made on the node that suits it, compute on the newest node and I/O on an older one.
  • Heat: heat from the lower die must pass through the die above it, which makes thermal design harder than in a flat layout.
  • Yield: one bad die scraps the stack, so every die must be tested good before bonding.

Two generations

From Solder Bumps to Copper-to-Copper Bonds

The two Foveros generations. Original Foveros joins a top die to the base die with solder micro-bumps and underfill. Foveros Direct bonds copper pads to copper pads with no solder, at a pitch roughly four times finer. Foveros Solder micro-bumps, 36-50 µm pitch BASE DIE WITH THROUGH-SILICON VIAS TOP DIE SOLDER BUMPS IN UNDERFILL Foveros Direct Copper-to-copper hybrid bond, 9 µm BASE DIE WITH THROUGH-SILICON VIAS TOP DIE COPPER PADS BONDED DIRECTLY; NO SOLDER, NO UNDERFILL

Original Foveros uses solder micro-bumps, from 50 µm on Lakefield to 36 µm on Meteor Lake. Foveros Direct bonds copper pad to copper pad at 9 µm with no solder and no underfill, which packs in far more connections and gives heat a direct path between dies. It needs hybrid bonders from BESI with Applied Materials, or from Tokyo Electron, and much cleaner, flatter surfaces. Bonding detail is on Hybrid Bonding.

Clearwater Forest

Clearwater Forest Brings Foveros Direct to Volume

Intel showed the Xeon 6+ Clearwater Forest at MWC in March 2026. It is Intel's first high-volume processor on Foveros Direct.

  • Compute: 12 tiles on Intel 18A, each with 24 Darkmont E-cores, for up to 288 cores per socket.
  • Base: three active base tiles on Intel 3, each with 192 MB of last-level cache; with 48 MB per compute tile, up to 576 MB in all.
  • I/O: two tiles on Intel 7, for 12 channels of DDR5-8000, 96 PCIe Gen 5 lanes and 64 CXL lanes.
  • Links: Foveros Direct at 9 µm between compute and base tiles, and EMIB bridges across the package.

Products

Every Intel Client Processor Since 2023

Products on Foveros
ProductYearStack
Lakefield2020Compute die on a 22FFL base die; the first Foveros product
Data Center GPU Max (Ponte Vecchio)202347 tiles with Foveros and EMIB
Core Ultra series 1 (Meteor Lake)2023Compute, graphics, SoC and I/O tiles on a base die; Foveros becomes Intel's default client design
Core Ultra series 2 (Arrow Lake, Lunar Lake)2024Compute tiles from TSMC N3B packaged by Intel on Foveros
Core Ultra series 3 (Panther Lake)2026First client processor on Intel 18A, launched at CES in January 2026
Xeon 6+ (Clearwater Forest)2026First high-volume Foveros Direct product

Arrow Lake and Lunar Lake show that Foveros does not depend on Intel wafers: their compute tiles came from TSMC and were stacked by Intel.

Foveros with EMIB

Vertical and Lateral in One Package

Intel often uses both technologies in one package: Foveros stacks dies vertically, and EMIB bridges join stacks or tiles side by side. Ponte Vecchio used both across 47 tiles, and Clearwater Forest uses Foveros Direct over its base tiles with EMIB between them. EMIB is covered on EMIB.

Sites

Stacked in New Mexico, With Malaysia Next

Foveros runs only in Intel's own plants; no OSAT offers it.

  • Made in US
  • US planned
  • Made abroad
Foveros sites
SiteLocationMakesStatusUS status
Intel Fab 9Rio Rancho, NMFoveros and EMIBOperating since January 2024Made in US
Intel Penang packaging complexPenang, MalaysiaAdvanced packaging including FoverosFirst phase starting 2026Made abroad
Placeholder: remaining Intel packaging rows from the fab dataset

Peers

Three Foundries, Three 3D Platforms

3D stacking platforms
PlatformCompanyFirst volume productBond
Foveros DirectIntelXeon 6+ Clearwater Forest, 2026Copper-to-copper hybrid bond at 9 µm
SoICTSMCAMD Ryzen 7 5800X3D (3D V-Cache), 2022Hybrid bond; see 3D IC and SoIC
SAINTSamsungNone publicly identifiedMicro-bump, with hybrid bond on the roadmap; see SAINT

Record

Page Record

Covers
Foveros stacking, the two generations, Clearwater Forest, products, Foveros with EMIB, sites and peers
Sources
Intel disclosures (MWC and Hot Chips); TrendForce (Clearwater Forest, March 2026); AnandTech (Rio Rancho investment, 2021); Intel newsroom (Fab 9, January 2024)
Last verified
October 2026