3D stacking
Dies Stacked on an Active Base Die
2.5D packaging (CoWoS, EMIB, I-Cube) places dies side by side. Foveros stacks them: an active base die carrying I/O, power delivery and often cache sits on the substrate, and compute and graphics tiles sit on top, joined through through-silicon vias (TSVs) in the base die.
- Shorter wires: vertical links are micrometers long instead of millimeters, cutting delay and energy per bit.
- Mixed nodes: each tile is made on the node that suits it, compute on the newest node and I/O on an older one.
- Heat: heat from the lower die must pass through the die above it, which makes thermal design harder than in a flat layout.
- Yield: one bad die scraps the stack, so every die must be tested good before bonding.
Two generations
From Solder Bumps to Copper-to-Copper Bonds
Original Foveros uses solder micro-bumps, from 50 µm on Lakefield to 36 µm on Meteor Lake. Foveros Direct bonds copper pad to copper pad at 9 µm with no solder and no underfill, which packs in far more connections and gives heat a direct path between dies. It needs hybrid bonders from BESI with Applied Materials, or from Tokyo Electron, and much cleaner, flatter surfaces. Bonding detail is on Hybrid Bonding.
Clearwater Forest
Clearwater Forest Brings Foveros Direct to Volume
Intel showed the Xeon 6+ Clearwater Forest at MWC in March 2026. It is Intel's first high-volume processor on Foveros Direct.
- Compute: 12 tiles on Intel 18A, each with 24 Darkmont E-cores, for up to 288 cores per socket.
- Base: three active base tiles on Intel 3, each with 192 MB of last-level cache; with 48 MB per compute tile, up to 576 MB in all.
- I/O: two tiles on Intel 7, for 12 channels of DDR5-8000, 96 PCIe Gen 5 lanes and 64 CXL lanes.
- Links: Foveros Direct at 9 µm between compute and base tiles, and EMIB bridges across the package.
Products
Every Intel Client Processor Since 2023
| Product | Year | Stack |
|---|---|---|
| Lakefield | 2020 | Compute die on a 22FFL base die; the first Foveros product |
| Data Center GPU Max (Ponte Vecchio) | 2023 | 47 tiles with Foveros and EMIB |
| Core Ultra series 1 (Meteor Lake) | 2023 | Compute, graphics, SoC and I/O tiles on a base die; Foveros becomes Intel's default client design |
| Core Ultra series 2 (Arrow Lake, Lunar Lake) | 2024 | Compute tiles from TSMC N3B packaged by Intel on Foveros |
| Core Ultra series 3 (Panther Lake) | 2026 | First client processor on Intel 18A, launched at CES in January 2026 |
| Xeon 6+ (Clearwater Forest) | 2026 | First high-volume Foveros Direct product |
Arrow Lake and Lunar Lake show that Foveros does not depend on Intel wafers: their compute tiles came from TSMC and were stacked by Intel.
Foveros with EMIB
Vertical and Lateral in One Package
Intel often uses both technologies in one package: Foveros stacks dies vertically, and EMIB bridges join stacks or tiles side by side. Ponte Vecchio used both across 47 tiles, and Clearwater Forest uses Foveros Direct over its base tiles with EMIB between them. EMIB is covered on EMIB.
Sites
Stacked in New Mexico, With Malaysia Next
Foveros runs only in Intel's own plants; no OSAT offers it.
- Made in US
- US planned
- Made abroad
| Site | Location | Makes | Status | US status |
|---|---|---|---|---|
| Intel Fab 9 | Rio Rancho, NM | Foveros and EMIB | Operating since January 2024 | Made in US |
| Intel Penang packaging complex | Penang, Malaysia | Advanced packaging including Foveros | First phase starting 2026 | Made abroad |
| Placeholder: remaining Intel packaging rows from the fab dataset | ||||
Peers
Three Foundries, Three 3D Platforms
| Platform | Company | First volume product | Bond |
|---|---|---|---|
| Foveros Direct | Intel | Xeon 6+ Clearwater Forest, 2026 | Copper-to-copper hybrid bond at 9 µm |
| SoIC | TSMC | AMD Ryzen 7 5800X3D (3D V-Cache), 2022 | Hybrid bond; see 3D IC and SoIC |
| SAINT | Samsung | None publicly identified | Micro-bump, with hybrid bond on the roadmap; see SAINT |
Record
Page Record
- Covers
- Foveros stacking, the two generations, Clearwater Forest, products, Foveros with EMIB, sites and peers
- Sources
- Intel disclosures (MWC and Hot Chips); TrendForce (Clearwater Forest, March 2026); AnandTech (Rio Rancho investment, 2021); Intel newsroom (Fab 9, January 2024)
- Last verified
- October 2026