AI Data Center Supply Chain

NVIDIA Vera Rubin NVL72 · TSMC, HBM makers and CoWoS · chip content per gigawatt

An AI data center is now bought by the gigawatt, and NVIDIA puts its own share of a Vera Rubin gigawatt at about $40 billion, up from $18 billion on Hopper. Every compute chip in that gigawatt is made by TSMC and packaged on CoWoS in Taiwan, with HBM from Korea; the first US-made AI logic dies come from Arizona, but US packaging starts only in 2028.

NVIDIA revenue opportunity per gigawatt of AI data center capacity, as stated by Jensen Huang in August 2026: about 18 billion dollars on Hopper, about 25 billion on Grace Blackwell and about 40 billion on Vera Rubin. Below, Bernstein's split of about 35 billion dollars of capital spending per gigawatt: compute 39%, networking 13%, mechanical and electrical systems about a third, and the remainder for everything else. NVIDIA REVENUE OPPORTUNITY PER GIGAWATT, $ BILLION Hopper ~$18B Grace Blackwell ~$25B Vera Rubin ~$40B JENSEN HUANG, AUGUST 2026 EARNINGS CALL. NVIDIA REVENUE, NOT BUILD COST. WHERE ABOUT $35 BILLION PER GIGAWATT GOES (BERNSTEIN) 39% 13% 33% 15% Compute GPUS, CPUS, HBM INSIDE Networking SWITCHES, NICS, OPTICS Mechanical and electrical ABOUT A THIRD Everything else REMAINDER, COMPUTED BERNSTEIN, NOVEMBER 2025. NVIDIA PUTS A GIGAWATT AT $50 TO $60 BILLION; HUANG SAID IN AUGUST 2026 THE COST ROSE FROM ABOUT $30 BILLION TO $60 BILLION.
NVIDIA per GW, Rubin
~$40B
Rack power
190 to 230 kW
GPUs per GW
~380,000 (computed)
HBM4 per rack
20.7 TB
US CoWoS today
None
Hub
Spotlights

Inside the rack

A Vera Rubin Rack Holds 108 Processors and 20.7 TB of HBM4

The unit of AI data center purchasing is now the rack, not the server, and its contents are set by NVIDIA.

NVIDIA's Vera Rubin NVL72 is the rack most 2026 and 2027 AI campuses are being built around. It was ramping into full production by August 2026, with racks running at CoreWeave, Google Cloud, Microsoft Azure, Oracle Cloud Infrastructure and Nebius. The platform has seven chip designs: the Rubin GPU, the Vera CPU, the Groq 3 LPU, the NVLink 6 switch, the ConnectX-9 SuperNIC, the BlueField-4 DPU and the Spectrum-6 Ethernet switch.

What one Vera Rubin NVL72 rack holds
PartCount per rackMade byWhere
Rubin GPU72TSMC N3P logic, HBM4 from three memory makers, TSMC CoWoS-LTaiwan and Korea
Vera CPU36TSMCTaiwan
HBM420.7 TB in totalSK hynix, Samsung, MicronKorea, Japan, Taiwan
NVLink 6 switch9 switch traysTSMCTaiwan
ConnectX-9 SuperNIC8 per compute trayTSMCTaiwan
Power shelves and 800 V conversionPer rack designDelta, LITEON, Flex; SiC and GaN from Infineon, Navitas, onsemi and othersTaiwan, Southeast Asia, US

The rack draws about 190 kW in its Max Q setting and about 230 kW in Max P. The full set of suppliers behind each Rubin GPU, from wafer to final test, is on the NVIDIA Rubin supplier ring; the rack-level ring, including power and cooling, is on DatacentersX.

Who makes it

Every Compute Chip in the Rack Comes From TSMC

Who makes the chips in a Vera Rubin NVL72 rack. Rubin GPU logic dies: TSMC N3P in Taiwan. HBM4: SK hynix, Samsung and Micron in Korea, Japan and Taiwan. CoWoS-L packaging: TSMC in Taiwan. ABF substrate: Ibiden in Japan on Ajinomoto film. Vera CPU, NVLink 6 switches and ConnectX-9 NICs: TSMC in Taiwan. Optical lasers: Coherent in Sherman, Texas, and others. 800 volt power chips: Infineon, Navitas, onsemi, Texas Instruments and others, some made in the US. Final test: KYEC in Taiwan, with a US site planned. WHO MAKES THE CHIPS IN ONE VERA RUBIN RACK VERA RUBIN NVL72 72 GPUS, 36 CPUS 190 TO 230 KW Rubin GPU logic TSMC N3P TAIWAN HBM4 stacks SK hynix, Samsung, Micron KOREA, JAPAN, TAIWAN CoWoS-L packaging TSMC TAIWAN; ARIZONA BEFORE 2029 ABF substrate Ibiden on Ajinomoto film JAPAN Final test KYEC TAIWAN; US SITE PLANNED Vera CPU TSMC, N3-class TAIWAN NVLink 6, ConnectX-9 TSMC TAIWAN Optical lasers Coherent, Lumentum and others SHERMAN TX AND ABROAD 800 V power chips Infineon, Navitas, onsemi, TI US AND ABROAD Rack assembly Foxconn, Quanta, Wistron MEXICO, TAIWAN, TEXAS BOX FILL SHOWS US PRODUCTION STATUS. SOURCES: SX CHIP SUPPLIER RING FOR NVIDIA RUBIN; NVIDIA 800 V PARTNER LIST.
  • Made in US
  • Some US volume
  • US planned
  • Made abroad

Every compute chip in the rack is made by TSMC, and every GPU is packaged on TSMC CoWoS-L. The HBM comes from three memory makers, all outside the United States. Nothing in the compute path has a second foundry.

  • Logic: TSMC N3P for Rubin; NVIDIA's earlier Blackwell Ultra B300 logic die is the only AI accelerator part in the site's 80-row supplier dataset already made in the US at volume, at TSMC Fab 21 in Phoenix. See Leading-Edge Fabs.
  • HBM: the memory makers' share, the base die and the 12-high stacks are on HBM.
  • Packaging: NVIDIA holds nearly 60% of 2026 CoWoS supply; capacity and the Arizona plan are on CoWoS.

Per gigawatt

A Gigawatt Holds About 380,000 Rubin GPUs

One gigawatt of IT load divided into Vera Rubin NVL72 racks: at about 190 kilowatts a rack, about 5,260 racks, which hold about 379,000 Rubin GPUs, 189,000 Vera CPUs and about 109 petabytes of HBM4. Computed from NVIDIA rack specifications; facility overhead not counted. ONE GIGAWATT OF IT LOAD IN VERA RUBIN NVL72 RACKS (COMPUTED) 1 GW IT LOAD ~5,260 RACKS AT ~190 KW ~379,000 RUBIN GPUS ~189,000 VERA CPUS ~109 PB HBM4 72 GPUs and 36 CPUs per rack; 20.7 TB of HBM4 per rack; about 190 kW (Max Q) to 230 kW (Max P). A 1 GW campus holds fewer: cooling and networking outside the rack add to the load. RACK FIGURES: NVIDIA VERA RUBIN NVL72 SPECIFICATIONS VIA HASHRATE INDEX, MARCH 2026. DIVISION IS OURS.

Operators now announce AI campuses in gigawatts, and NVIDIA prices its opportunity the same way. On its August 2026 earnings call NVIDIA put its revenue at about $40 billion per gigawatt for Vera Rubin, against about $25 billion for Grace Blackwell and about $18 billion for Hopper. Jensen Huang also said the cost of a gigawatt of data center technology had risen from about $30 billion five years ago to about $60 billion.

Where capital spending per gigawatt goes (Bernstein estimate)
CategoryShare of spendMain chip content
Compute39%GPUs and CPUs with their HBM; about $13.7B of a $35B gigawatt (computed)
NetworkingAbout 13%Switch ASICs, NICs, retimers, optical transceivers and their lasers
Mechanical and electricalAbout a thirdPower conversion, UPS and drives: SiC, GaN and silicon power devices; controllers
Generators and turbines, inside the aboveAbout 6%Control electronics only
Transformers, inside the aboveAbout 5%Few chips today; solid-state transformers add SiC
Foundry, memory and wafer equipment shareAbout 3 to 4%What chipmakers and toolmakers capture, about $1 to 1.2B a gigawatt

Bernstein's November 2025 estimate put a gigawatt at about $35 billion; NVIDIA's own figure is $50 to $60 billion. The two disagree mainly on how much of the GPU price to count. Both put more than half the spend into chips and the systems built around them.

Power chips

800 Volt Racks Pull SiC and GaN Into the Data Center

Rack power has gone from about 40 kW for an air-cooled server rack to 190 to 230 kW for Vera Rubin, and NVIDIA's Kyber rack for Rubin Ultra, due in 2027, holds 576 GPUs and targets 1 MW. AMD's Helios rack of 72 GPUs runs about 225 to 245 kW; rack figures for each accelerator are on the DatacentersX AI Chip Layer page. At that density the 415 or 480 V AC used in data centers today needs more copper than fits, so NVIDIA is moving its partners to 800 V DC, which carries more than 150% more power through the same copper.

  • Silicon partners named by NVIDIA: Analog Devices, AOS, EPC, Infineon, Innoscience, MPS, Navitas, onsemi, Power Integrations, Renesas, Richtek, ROHM, STMicroelectronics and Texas Instruments.
  • Power content: Infineon estimates $100 to $250 of power semiconductors per kW of installed AI compute, and targets EUR 1.5 billion of AI data center power revenue in its current fiscal year, rising to EUR 2.5 billion in fiscal 2027.
  • SiC and GaN: 800 V conversion uses silicon carbide at the high-voltage stages and gallium nitride closer to the board. Wolfspeed's AI data center revenue more than doubled in its fiscal 2026. Die counts and substrate supply are on SiC: Nine Markets, One Wafer.

US production

US AI Campuses Run on Chips Made in Taiwan and Korea

  • Made in US
  • Some US volume
  • US planned
  • Made abroad
Where the chips in a US AI campus are made
PartUS siteStatusUS status
Blackwell Ultra B300 logic dieTSMC Fab 21, Phoenix, ArizonaIn volume; the one US-made row of 80 in the site's AI chip supplier datasetMade in US
Rubin-class logic (N3)TSMC Arizona second fabN3 production from 2027US planned
CoWoS-class packagingAmkor, Peoria, Arizona; TSMC Arizona packagingAmkor from early 2028; TSMC before 2029US planned
Final testKYEC US sites, prepaid by NVIDIASites not disclosedUS planned
HBM4None; SK hynix packaging plant in West Lafayette, Indiana planned for 2028Korea, Japan and Taiwan todayMade abroad
Optical lasersCoherent, Sherman, Texas (6-inch InP)Operating and expandingSome US volume
Rack assemblyFoxconn, Wistron and others in TexasRamping; most racks still built in Mexico and TaiwanSome US volume

Meta raised its 2026 capital spending guidance to $125 billion to $145 billion in April 2026, and the four largest US cloud companies together were reported above $700 billion for the year. Almost all of the compute in those campuses is fabricated, stacked and packaged in Taiwan and Korea. The US share is rising from logic outward: wafers in Arizona now, packaging from 2028 and memory later. US fab status is tracked on US Reshoring.

China

China Builds Its AI Data Centers on Huawei and SMIC

Chinese AI data centers run on a separate stack. US export rules keep NVIDIA's leading GPUs out, and Chinese buyers have been told to favor domestic chips, so Huawei's Ascend 910C and its successors, built by SMIC on 7nm-class processes with stockpiled HBM, carry most new Chinese training capacity. China's AI campuses face the reverse constraint: power is cheap and plentiful, chips and HBM are not. That supply chain is on Huawei and HiSilicon and China Bifurcation.

Record

Page Record

Covers
Vera Rubin NVL72 rack contents, chip suppliers and locations, chip content and capital spend per gigawatt, 800 V power semiconductors, US production status and China
Sources
NVIDIA Vera Rubin NVL72 specifications via Hashrate Index (March 2026); NVIDIA fiscal 2Q27 call via Magica (August 2026); Bernstein via Investing.com (November 2025); Data Center Dynamics on 800 V DC (October 2025); PCIM Europe chip industry update (July 2026, Infineon figures); Yahoo Finance on 2026 capex (May 2026); SX chip supplier ring dataset (October 2026)
Last verified
October 2026